PS Road Marking Services plans and executes thermoplastic road marking for Chandigarh, Chandigarh. The local constraint is planned sector geometry and high night speeds. Crews treat Madhya Marg / Dakshin Marg and NH-5 links and connected municipal links as working sites, not brochure maps.
Do not buy the cheapest first coat
Work is specified against IRC:35. Engineering Department, UT and NHAI contractors around Chandigarh expect measurable items: thickness or sheeting grade, colour, spacing, and a photo log. We write those into the method statement before mobilising from Delhi.
Typical problem locations in this market include sector roundabouts. Peak weather risk is July–August. That calendar drives when we apply thermoplastic so beads, epoxy or galvanising are not washed or cooked on day one.
A low first coat in Chandigarh looks cheap until Engineering Department, UT pays for a second mobilisation within a year. We price whole-life: one thermoplastic or barrier package versus repeated paint and traffic management on Madhya Marg / Dakshin Marg and NH-5 links.
What you receive on site
A nominated supervisor, calibrated equipment where the item needs it, and a close-out note with quantities. Related reading: our Thermoplastic Road Marking service page and the technical blog.
To mobilise a crew to Chandigarh, email hello@psroadmarking.in or use the quote form. Mention chainage or factory gate, IRC clause if known, and whether night work is allowed.
Why a Delhi-based specialist still shows up in Chandigarh
PS Road Marking Services is GST-registered in Delhi and executes pan-India. Chandigarh is not a franchise sticker: the same thermoplastic, stud, signage and barrier disciplines used on NCR highways are used here, adjusted for planned sector geometry and high night speeds.