PS Road Marking Services plans and executes crash barriers for Bengaluru, Karnataka. The local constraint is IT-corridor night speeds, lakeside moisture and ORR weaving. Crews treat NICE Road, ORR and NH-44 and connected municipal links as working sites, not brochure maps.
Forklifts are not highway traffic — but they still erase lines
Work is specified against IRC:SP:73. Karnataka PWD / BDA and NHAI contractors around Bengaluru expect measurable items: thickness or sheeting grade, colour, spacing, and a photo log. We write those into the method statement before mobilising from Delhi.
Typical problem locations in this market include electronic city and airport approaches. Peak weather risk is June–October. That calendar drives when we install crash barriers so beads, epoxy or galvanising are not washed or cooked on day one.
Private yards around Bengaluru need aisle barriers that forklifts and trailers can read at 15 km/h as well as cars at 80 km/h on the public approach. We separate highway IRC items from factory floor items so the store manager and the highway engineer are not fighting one drawing.
What you receive on site
A nominated supervisor, calibrated equipment where the item needs it, and a close-out note with quantities. Related reading: our W-Beam Crash Barriers service page and the technical blog.
To mobilise a crew to Bengaluru, email hello@psroadmarking.in or use the quote form. Mention chainage or factory gate, IRC clause if known, and whether night work is allowed.
Why a Delhi-based specialist still shows up in Bengaluru
PS Road Marking Services is GST-registered in Delhi and executes pan-India. Bengaluru is not a franchise sticker: the same thermoplastic, stud, signage and barrier disciplines used on NCR highways are used here, adjusted for IT-corridor night speeds, lakeside moisture and ORR weaving.