PS Road Marking Services plans and executes traffic signage for Gurugram, Haryana. The local constraint is dust, heat and high night traffic on the expressway corridor. Crews treat NH-48 and the SPR / Golf Course Road network and connected municipal links as working sites, not brochure maps.
Two clients, two measurement books
Work is specified against IRC:67. Haryana PWD / GMDA and NHAI contractors around Gurugram expect measurable items: thickness or sheeting grade, colour, spacing, and a photo log. We write those into the method statement before mobilising from Delhi.
Typical problem locations in this market include cyber-city interchanges. Peak weather risk is July–August. That calendar drives when we fabricate and install signs so beads, epoxy or galvanising are not washed or cooked on day one.
NH packages and municipal packages around Gurugram use different measurement books. We keep IRC:67 as the technical floor and let the tender decide the pay item.
What you receive on site
A nominated supervisor, calibrated equipment where the item needs it, and a close-out note with quantities. Related reading: our Traffic Signage service page and the technical blog.
To mobilise a crew to Gurugram, email hello@psroadmarking.in or use the quote form. Mention chainage or factory gate, IRC clause if known, and whether night work is allowed.
Why a Delhi-based specialist still shows up in Gurugram
PS Road Marking Services is GST-registered in Delhi and executes pan-India. Gurugram is not a franchise sticker: the same thermoplastic, stud, signage and barrier disciplines used on NCR highways are used here, adjusted for dust, heat and high night traffic on the expressway corridor.