PS Road Marking Services plans and executes road safety consultancy for Pune, Maharashtra. The local constraint is ghat approaches, IT-corridor night speeds and monsoon. Crews treat Mumbai–Pune Expressway and NH-48 and connected municipal links as working sites, not brochure maps.
Children do not read IRC — drivers must
Work is specified against IRC / MoRTH suite. MSRDC / PWD and NHAI contractors around Pune expect measurable items: thickness or sheeting grade, colour, spacing, and a photo log. We write those into the method statement before mobilising from Delhi.
Typical problem locations in this market include Hinjewadi and ring-road junctions. Peak weather risk is June–September. That calendar drives when we review specifications and execute so beads, epoxy or galvanising are not washed or cooked on day one.
Placement distance is a function of speed. A school-zone package in Pune is not copied from an expressway gore. We review specifications and execute to the design speed of that link, then confirm sight lines on site.
What you receive on site
A nominated supervisor, calibrated equipment where the item needs it, and a close-out note with quantities. Related reading: our Road Safety Consultancy service page and the technical blog.
To mobilise a crew to Pune, email hello@psroadmarking.in or use the quote form. Mention chainage or factory gate, IRC clause if known, and whether night work is allowed.
Why a Delhi-based specialist still shows up in Pune
PS Road Marking Services is GST-registered in Delhi and executes pan-India. Pune is not a franchise sticker: the same thermoplastic, stud, signage and barrier disciplines used on NCR highways are used here, adjusted for ghat approaches, IT-corridor night speeds and monsoon.