PS Road Marking Services plans and executes traffic signage for Mumbai, Maharashtra. The local constraint is salt air, monsoon flooding and 24-hour traffic. Crews treat WEH, EEH and the Mumbai–Pune Expressway approaches and connected municipal links as working sites, not brochure maps.
Item rates that match the drawing
Work is specified against IRC:67. MSRDC / MCGM and NHAI contractors around Mumbai expect measurable items: thickness or sheeting grade, colour, spacing, and a photo log. We write those into the method statement before mobilising from Delhi.
Typical problem locations in this market include coastal and elevated corridors. Peak weather risk is June–September. That calendar drives when we fabricate and install signs so beads, epoxy or galvanising are not washed or cooked on day one.
Documents we attach to the quotation
- Applicable IRC / MoRTH clause list for traffic signage
- BOQ matched to chainage or building grid, not a lump sum guess
- GST invoice from PS Road Marking Services (07HQPPS0545L1Z3)
What you receive on site
A nominated supervisor, calibrated equipment where the item needs it, and a close-out note with quantities. Related reading: our Traffic Signage service page and the technical blog.
To mobilise a crew to Mumbai, email hello@psroadmarking.in or use the quote form. Mention chainage or factory gate, IRC clause if known, and whether night work is allowed.
Why a Delhi-based specialist still shows up in Mumbai
PS Road Marking Services is GST-registered in Delhi and executes pan-India. Mumbai is not a franchise sticker: the same thermoplastic, stud, signage and barrier disciplines used on NCR highways are used here, adjusted for salt air, monsoon flooding and 24-hour traffic.